GSP Resource Corp. Completes Phase 1 Drilling at Alwin Mine Project

  • Phase 1 Drill Program expanded to 10 holes and ~2000 meters
  • GSP Drilling intersected new “Alwin Style” mineralization North of historic Alwin Zone

VANCOUVER, British Columbia, Nov. 05, 2020 (GLOBE NEWSWIRE) — GSP Resource Corp. (TSX-V: GSPR) (FRA: 0YD) (the “Company” or “GSP”) reports that it has completed a 10 hole Phase 1 drill program at its Alwin Mine Copper-Silver-Gold Project. The Phase 1 drill program was increased from an initial budget of 1000 meters, to a total of nearly 2000 meters of diamond drilling. The initial eight holes of the program targeted shallow mineralization in the Alwin Mine #4 North east and #4 North west zones (see news release dated September 24, 2020), with assays from these holes currently pending. The program was subsequently expanded to test targets to the North and South of the initial shallow targets near the Alwin Mine #4 zone. Core logging, sampling, and final shipment of these two additional drill holes are expected to be completed in the next two weeks.

View: Alwin 2020 Phase 1 Drill Program Plan Map

Hole AM-20-09 was collared 50 meters north of the west end of the # 4 zone and was drilled north at a -75 degree dip to a depth of 868 metres and into the centre of a 2006 250 metre depth chargeability anomaly. The first 150 metres of the hole intersected “Alwin style” replacement copper sulphide mineralized zones. These zones are interpreted to occur within west striking subvertical structures that have intense sericite alteration sometimes with accompanying silicification. Also present throughout much of the hole are steeply dipping fractures that host quartz veining, chalcopyrite, bornite and possible chalcocite mineralization both within the quartz veins, fractures and in fracture adjacent sericitic altered wallrock envelopes. The hole also hosts, below 400 metres, individual and swarms of less than 20 cm thick steeply dipping quartz veins that host pyrite and chalcopyrite mineralization.

Hole AM-20-10D was collared at the south edge of the property some 275 metres southwest of the shallow drilled area to test a deep historic drill intersection below the deepest mined level. The hole was abandoned in workings short of the target. Hole AM-20-10E was a wedge hole and successfully intersected the target at 285 metres. The top of holes 10D And E intersected several quartz veins hosting chalcopyrite and pyrite mineralization similar to that encountered in the deeper portion of Hole 9.

All drill holes have had down hole surveys completed at 15 to 30 metre intervals. The casing has been left in all holes. The shallow drill hole collars have been tight chain and compass surveyed to the local historic mine grid. The core sampling program includes, random ¼ split duplicates, and the random insertion of field blanks and three different standards. Density measurements of the different mineralized zones and the surrounding host rock have been and are being taken. All mineralized intervals have been bracket sampled.

The Alwin Mine Copper-Silver-Gold property is approximately 575.72 hectares and is located on the semi-arid, interior plateau in south-central British Columbia. The underground historic mine, which was developed over a 500 meters long by 300 meters deep by 150 meters wide area produced from 1916 to 1981 from six major subvertical zones 233,100 tonnes that milled 3,786 tonnes of copper, 2,729 kilograms of silver and 46.2 kilograms of gold. Gold and silver content associated with bornite increase with depth within the individual mineralized zones.

The property also hosts several incompletely explored deep porphyry copper exploration targets to the north and west of the mine. It is adjacent to the western boundary of Teck Corporation’s Highland Valley Mine, the largest open-pit porphyry copper- molybdenum mine in western Canada. Alteration and mineralization of the Highland Valley hydrothermal system extends westward onto the Alwin property (see GSP’s news release dated January 30, 2020).

Qualified Person: The scientific and technical disclosure contained in this news release has been reviewed and approved by Leopold J Lindinger, P. Geo, a consultant of the Company and a “Qualified Person” as that term is defined in National Instrument 43-101 – Standards of Disclosure for Mineral Projects. Mr. Lindinger verified the data disclosed which includes a review of the analytical and test data underlying the information and opinions contained therein. Mineralization hosted on nearby properties is not necessarily indicative of mineralization that may be hosted on the Alwin property.

About GSP Resource Corp.: GSP Resource Corp. is a mineral exploration & development company focused on projects located in Southwestern British Columbia. The Company has an option to acquire a 100% interest and title to the Alwin Mine Copper-Gold-Silver Property in the Kamloops Mining Division, as well as an option to acquire 100% interest and title to the Olivine Mountain Property in the Similkameen Mining Division.

Contact Information – For more information, please contact:
Simon Dyakowski, Chief Executive Officer & Director
Tel: (604) 619-7469
Email: simon@gspresource.com

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Forward-Looking Information

This news release contains “forward‐looking information or statements” within the meaning of applicable securities laws, which may include, without limitation, future exploration work on the Company’s projects, receipt of assays, other statements relating to the technical, financial and business prospects of the Company, its projects and other matters. All statements in this news release, other than statements of historical facts, that address events or developments that the Company expects to occur, are forward-looking statements. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results may differ materially from those in the forward-looking statements. Such statements and information are based on numerous assumptions regarding present and future business strategies and the environment in which the Company will operate in the future, including the price of metals, the ability to achieve its goals, that general business and economic conditions will not change in a material adverse manner, that financing will be available if and when needed and on reasonable terms. Such forward-looking information reflects the Company’s views with respect to future events and is subject to risks, uncertainties and assumptions, including the risks and uncertainties relating to the interpretation of exploration results, risks related to the inherent uncertainty of exploration and cost estimates and the potential for unexpected costs and expenses and those other risks filed under the Company’s profile on SEDAR at www.sedar.com. Factors that could cause actual results to differ materially from those in forward looking statements include, but are not limited to, continued availability of capital and financing and general economic, market or business conditions, adverse weather conditions, failure to maintain all necessary government permits, approvals and authorizations, the impact of Covid-19 or other viruses and diseases on the Company’s ability to operate, decrease in the price of copper and other metals, failure to maintain community acceptance (including First Nations), increase in costs, litigation, and failure of counterparties to perform their contractual obligations. The Company does not undertake to update forward‐looking statements or forward‐looking information, except as required by law.

Primary Logo